- home >
- case studies

Case Studies
| Client | Title | File |
|---|---|---|
| Multiple | Pin-Point Positioning - DeepLand | download |
| Petrofac | Petrofac Don SW and West Don Project | download |
| Confidential | Pipeline Installation Analysis | download |
| Shell | Shell Bonga: Design Verification | download |
| Shell | Shell Brent Bravo: Redevelopment | download |
| Shell | Shell Pierce: Redevelopment | download |
| Statoil | Statoil Åsgard: Norwegian Petroleum Directorate | download |
| Talisman Energy | Talisman Galley: Flexible Riser Damage | download |
| Lundin Petroleum | Lundin Broom: Subsea Tieback to a Fixed Platform | download |
| Petrobras | Petrobras: Steel Catenary Riser, Marlim Field | download |
| Apache | Apache Van Gogh: Flexible Pipe Delivery Management | download |
| Coogee Resources | Coogee Resources: Montara | download |
| GlobalSantaFe | DeepDrift: On-Board Vessel Drift-Off Simulator | download |
| Exxon Mobil | ExxonMobil: Configuration Design | download |