This is a JIP to develop a fatigue analysis methodology for flexible pipes. The background to this initiative lies in the general industry acceptance that most flexible pipe fatigue analysis methodologies lack the level of sophistication necessary to adequately determine the fatigue life of flexible risers. Equally, existing methodologies lack the independence, consistency and level of transparency that is increasingly being demanded by the industry.
For more detailed information on this JIP please click here >>
| Participants | Schedule | Related Pages | ![]() |
BP ChevronTexaco ConocoPhillips ExxonMobil NKT Flexibles Petrobras Shell Statoil Technip Wellstream |
Real Life commenced in October 2003 and is due for completion in June 2007. | Flexible Pipe Technology |
|---|

