Resource Library > Experience > Experience - Flexible Pipe Technology

Client Project Project Description
CNR Baobab Riser and umbilical design verification: design document review, frequency screening, local flexible pipe cross section model, flexible pipe fatigue check, interference analysis and technical support.
BP West of Shetland
  • Integrity Management Strategy for the Foinaven and Schiehallion fields, incorporating:
  • Risk Analysis for both assets based on the Failure Driver Methodology, which was developed in-house.
  • Produce Integrity Management Strategy from the Risk Analysis.
  • Perform annual Periodic Reviews on both assets to report on all the integrity issues identified in the IMS.
  • Liase with ROV contractors and review of  their inspection procedures on behalf of the client.
  • Troubleshooting key integrity issues which previously did not require resolution, such as resolving ongoing curvature anomalies by developing an inspection procedure in collaboration with the ROV contractor and comparing the results of the inspection with in-house analysis.
Shell Pierce Pre-feed analysis of options for the redevelopment of the Pierce field.  Design Verification and technical support to project completion.
Woodside Enfield Design Verification of New Build FPSO Riser system.  Establish design basis, review documents, provide technical support on the flexible riser system.  Independent riser design verification.  Manufacturing support for flexible pipe.
Marathon Alvheim Establish flexible riser design requirements and prepare Preliminary Design Basis against which initial riser designs can be evaluated.  Preliminary design basis to include design criteria, environmental data, system data and design methodology, and to develop load case and riser configuration screening matrix.