CNR |
Baobab |
Riser and umbilical
design verification: design document review, frequency screening,
local flexible pipe cross section model, flexible pipe fatigue check,
interference analysis and technical support. |
|
BP |
West of Shetland |
- Integrity Management
Strategy for the Foinaven and Schiehallion fields, incorporating:
- Risk
Analysis for both assets based on the Failure Driver Methodology,
which was developed in-house.
- Produce
Integrity Management Strategy from the Risk Analysis.
- Perform
annual Periodic Reviews on both assets to report on all the integrity
issues identified in the IMS.
- Liase
with ROV contractors and review of their inspection
procedures on behalf of the client.
- Troubleshooting
key integrity issues which previously did not require resolution,
such as resolving ongoing curvature anomalies by developing an inspection
procedure in collaboration with the ROV contractor and comparing
the results of the inspection with in-house analysis.
|
|
Shell |
Pierce |
Pre-feed analysis
of options for the redevelopment of the Pierce field. Design
Verification and technical support to project completion. |
|
Woodside |
Enfield |
Design Verification
of New Build FPSO Riser system. Establish design basis,
review documents, provide technical support on the flexible riser
system. Independent riser design verification. Manufacturing
support for flexible pipe. |
|
Marathon |
Alvheim |
Establish flexible riser design requirements and prepare
Preliminary Design Basis against which initial riser designs can
be evaluated. Preliminary design basis to include design
criteria, environmental data, system data and design methodology,
and to develop load case and riser configuration screening matrix. |